Fly Peoria non-stop to more destinationsGo to Flypia.com home page
Home
Passenger Services
Visitor’s Guide & Accommodations
About Us
Contact Us
Rewards Program

Flights

Arrivals & Departures

Airlines

Allegiant Travel Las Vegas
Phoenix/Mesa
Punta Gorda
Tampa/St.Petersburg

American Eagle Chicago
Dallas/Fort Worth

Delta Atlanta
Detroit
Minneapolis

United Airlines Chicago
Denver

Fixed Base Operators

Peoria Aviation

Byerly Aviation

TSA Travel Tips Information and answers to common traveler questions.

Customer Service
Survey

Press Room

Photo Gallery

Directions to Airport

FAQ

Our Tenants

Peoria Area
Convention and
Visitors Bureau

Airport Operations

Our Gallery

April 27, 2011 Terminal Opening

McCoy Schock LaHood ArdisSheriff Michael McCoy, Congressman Aaron Schock, Secretary of Transportation Ray LaHood and Peoria Mayor Jim Ardis
Dean HeinzmanDean Heinzman
Raymond LaHood and Kathryn DowningUnited States Secretary of Transportation Raymond LaHood and Kathryn Downing cut the ribbon

ARRA/Stimulus related construction activities for October 2010

Architectural Lighting in area A 10.21.10
Concrete pour at parking spots at new roadway 10.06.10
Exit lane glass progress 10.21.10
Lawn sprinkler installation at west side of West Terminal (Area A) 10.29.10
Premier Lot concrete pour at west side of terminal 10.15.10
Light fixture and all panel installation at East Terminal (Area B) 10.29.10
Premier Lot entrance concrete pour 10.29.10
SidewalkSidewalk at NE corner of site along temp drive 10.21.10
Light fixture installation at East Terminal (Area B) 10.27.10

Bradley Tour of Terminal

Bradley Tour of Terminal
Bradley Tour of Terminal

Contest Winner

Spring Training Trip Winner 2011Congratulations to Tom Shryock of Pekin, our Grand Prize winner of the 2011 Spring Training Trip to Mesa!

Terminal Construction

Aluminum framing installation at center of Concourse for glass curtain wall
Aluminum framing installation at north side of East Terminal (Area B) car rental area
Clerestory installation at Col M in East Concourse (Area D)
Concrete installation at Apron on south side of East Concourse (Area D) looking east
Concrete pour at south side of West Concourse (Area C)
Door frame installation at door #118D in West Terminal (Area A)
Electrical backfeed of existing terminal excavation near existing terminal bag make-up
Electrical conduit and clerestory glass installation at west end of West Terminal (Area A)
Electrical panel wiring at PBB Gate 10
Excavation and removal of soil for GSE pavement at west side of Security Hall
Generator removal at existing terminal
Glass installation at Col M,7
Grading and forming for Apron paving connection to building at south side of West Concourse (Area C)
Sitework for road at north side at terminal

Terminal Groundbreaking Ceremony

Very Important Preview Event

Current and past commissioners that were present at the Very Important Preview Event.
facebook©2013 Peoria International Airport