News Release

Date: Back to previous page

Construction Progress Requires Parking/Roadway Changes

Peoria, IL—The Metropolitan Airport Authority of Peoria (MAAP) would like to announce changes to the parking lot and roadways related to construction of the new terminal building at the General Wayne A. Downing Peoria International Airport. The current Airport Entrance will be modified to allow for the grading and paving of roadways and sidewalks that will serve the new facility. Signs will be in place guiding travelers along the detours inside the parking lot to the existing terminal building lower and upper level drop-off areas. All drop-off areas will remain open during this time.

In addition, the Long Term Parking lot entrance will be closed. The Long Term Parking lot exit will remain open so that anyone currently parked in this lot will be able to exit. All travelers are asked to park in the Short Term Parking lot during this closure. The Metropolitan Airport Authority of Peoria appreciates your cooperation and patience during this time.

A directional map and construction updates will be available for viewing on the airport website at www.flypia.com

Back to previous page