Construction Alert! Please plan accordingly when traveling to and from the airport! Construction is happening on Interstate 474 – Airport Exits. Construction Maps & Updates
PIA Conference Suite
Whether you are looking for a unique location for an off-site meeting, or need a close and convenient location to speak with out-of-town clients, our Premier Conference Suite fits the bill. This 830-square-foot room has modular-style seating/tables for up to 24 guests and includes computer data ports. Using the suite for the entire day? Bring in a caterer of your choice or coordinate food and beverage services with the airport restaurant. Remember that anyone can book the Premier Conference Suite. You don’t need to be traveling.
Call: (309) 697-8272
Email: bschmitt@flypia.com
Beginning April 14, 2025, construction traffic will begin on Phase 1 of the new Air Traffic Control Tower.
Construction will take place for 1 year, immediately followed by Phase 2, which will take an additional year.
For the duration of the project, the main terminal drive will be reduced to one lane between the Old Tower and the merge to Dirksen Parkway. In this section of roadway, outbound traffic will use the left lane, and construction traffic will use the right lane. This is to allow consturction traffic access to the work site (as shown in the map below).
Safe Travels and Thank You for flying PIA!